The refurbished carriages have received new floors, ceilings, lights, seats and brakes, as the vehicles suffer badly from weather-related corrosion in their exposed cliffside location.
The historic cliff lift now plans to reopen in mid-May, but no date has been confirmed.
9. Tramway Carriages Return
The carriages were carefully lowered into place. Photo: Richard Ponter
10. Tramway Carriages Return
Spectators gathered to welcome the carriages return. Photo: Richard Ponter
11. Tramway Carriages Return
An engineer prepares the carriage for the lift. Photo: Richard Ponter
12. Tramway Carriages Return
An engineer helps guide the carriage into place during the lift. Photo: Richard Ponter